Folks
Elio Addict
Launch pad 39B, the Vehicle Assembly Building, and Crawlerway, which have been in use since the Apollo missions, are all currently being refurbished and readied for launches of the government-owned Space Launch System which is supposed to begin in 2017.
United Launch Alliance currently uses launch pads 37 and 41 for launching Delta and Atlas rockets respectively. In December ULA launched the first test flight of the new Orion human rated space capsule for the SLS system from pad 37. ULA is also currently upgrading launch pad 41 for human rated flights of the CST-100 capsule destined to take crews to the International Space Station with launches beginning in 2017.
SpaceX have also leased former Apollo and Space Shuttle pad 39A which is currently being upgraded be used primarily to launch their larger Falcon Heavy rockets along with their human space flight missions to the international space station which are scheduled to begin in 2017.
Seems Goofy one is letting on a little as to what he does for a living. Is it ok to ask what your occupation is, G1? You've already revealed that you have a head full of space. LOL