It's gotten pretty far away from the starting topic.
So has the latest production start date. :p

Just to bring things back on topic ... does anyone have a link the latest released production timeline handy? I think we're paused somewhere around month 4-6 of a 15 month production plan. If that's right, vehicles should start getting delivered ~9-11 months from when the production funding is announced.
 

Coss

Moderator
Staff member
Moderator
Joined
Sep 5, 2014
Messages
11,100
Reaction score
16,396
Location
Battle Ground WA
Just to bring things back on topic ... does anyone have a link the latest released production timeline handy? I think we're paused somewhere around month 4-6 of a 15 month production plan. If that's right, vehicles should start getting delivered ~9-11 months from when the production funding is announced.

Where did you hear that? And what did you use for a starting date?
 

Billy Rubin

New Member
Joined
Apr 11, 2017
Messages
4
Reaction score
2
Location
CANTON
Have any Elios been delivered? Read something here about a guy seeing a few on the road. I've been watching 3 wheeled vehicles over the last 20 years come and go, but none make it to production. This is a shame because I really like the idea. How about an amphibious version of the Elio if it makes it to full production>>>>>

 
Last edited:

Travelbuzz1

Elio Addict
Joined
Jul 21, 2015
Messages
751
Reaction score
675
Location
Sioux Falls, South Dakota
Have any Elios been delivered? Read something here about a guy seeing a few on the road. I've been watching 3 wheeled vehicles over the last 20 years come and go, but none make it to production. This is a shame because I really like the idea. How about an amphibious version in the future>>>>>

None are on the road as of yet.
 

Johnny Acree

Elio Addict
Joined
May 12, 2014
Messages
1,530
Reaction score
2,573
I found my copy of the Plan of operation with the chart
Plan of Operations

Much of the vehicle engineering has been completed, and we are finalizing our engineering simulations, which suggest that the important vehicle performance milestones can be achieved. To date, $17.4 million has been invested in vehicle engineering and development. We are now seeking $25 million in funding from this Regulation A offering to fund the build of 25 prototypes and the completion of the safety and final engineering tests. Upon completion of this phase, which management expects to take six months, the vehicle production costs, as well as the performance and safety profiles, will be understood to a level that will allow for the kick-off of hard tooling. With the development risks addressed, we will then be in a position to raise larger amounts of capital - to be up to another estimated $240 million to fund production activities. The diagram below portrays the stages of development for the current financing round and the subsequent phases leading to production.
1time.png

diagram1.jpg


We are in the process of refining our production plans with suppliers to start production in 15 months from the completion of this offering. The key milestones for the 15-month schedule are as follows (with E1, S1 and S2 referring to various vehicle prototype phases):



$25M Regulation A offering underway


E1 Engineering drawing release – Month 2


E1 Builds begin – Month 3


E1 Testing – Month 4


S1 Production drawing release & tooling kickoff - Month 7


Order long lead equipment – Month 9


Shreveport plant integration – Month 9


Initial 10 retail locations selected – Month 10


Retail lease agreements signed – Month 11


Service partner agreements signed – Month 11


S1 Builds and production validation – Month 13


Initial 10 retail stores build out complete – Month 14


S2 Builds & EPA/CARB certification complete – Month 14


Start of Production – Month 15
 

Grumpy Cat

Elio Addict
Joined
Mar 4, 2014
Messages
888
Reaction score
1,383
Location
WI
I found the 15 month schedule. It was in the offering statement for the Reg A+ filing. And by "month 4" I meant that the milestones that have been met were representative of month 4 of the schedule.
Except Elio has even built the second batch (13) for engineering vehicles. I don't think they even finished the 5 for the first batch. I only recall the 4. In addition, they haven't started the 100 build...
 

Rickb

Elio Addict
Joined
Apr 20, 2014
Messages
7,094
Reaction score
13,965
Except Elio has even built the second batch (13) for engineering vehicles. I don't think they even finished the 5 for the first batch. I only recall the 4. In addition, they haven't started the 100 build...
That's interesting. So with that said........what did EM spend the Reg A+ funding round on that was earmarked specifically for E builds/testing/validation? Not many completed production milestones from that list?? Odd.
 