The SEC filing from last week says production will begin in 15 months if additional financing is obtained. Does this mean production will begin at the end of 2017 at best but more likely 2018? Hope to get mine sooner than later.
The previous SEC filing indicated that it wasn't just a matter of funding, but how the E-series testing went. So, there's another variable. No one can give you more than speculation. Optimistically, if they get the funding required they'll be producing vehicles late-2017, and a more realistic assessment would be early-mid 2018.
Here we go again; this has been brought up a number of times, production is most likely going to start mid-2017
The General Public won't be able to buy until 2018 after all of the reservation holders have gone through the chance to buy.
And it's 15 months since the Reg-C was filed so the start date your using if off some.
But just to save rehashing the same debate, do a search for any of the Threads of production starting.
Form 10-12B was filed on 7/25/16 which was just last week. On page 19 under Plan of Operations it states, "we are in the process of refining our production plans with suppliers to start production in 15 months." 15 months from now puts us around November of 2017 when parts will start to arrive in Shreveport.
The SEC filing was a reality check for me. I was disappointed with the time line, but fully aware that it was a realistic assessment.
It was almost like taking a bitter medicine. It is good for me, but I don't have to like it. I do appreciate knowing what is happening.
That's from page 7, post 67
I would suggest reading that one first; and continue, or go all the way back to the beginning of that thread and start reading.
Yes, I know that will take some time, and why spend the time when you think your right.
It's because this has all be talked about before.
Stop beating a dead horse