I have a lot of experience in building manufacturer facilities but not much in the Automotive industry .The only one that we did a little consulting for was GM at the Bowling Green plant .The budget was $50,000,000 to convert the production line from C5 to C6 Corvettes .That was an existing production line that did not include engines or transmissions .Oh ,and there was a $15,000,000 cost over run .
This said I doubt that Mr Elio would not have gotten this far without a good business plan that addresses the engine build .