Ty
Elio Addict
They are hand-building 23 for testing... not crash testing. The first went to Continental so they can finish up the traction control system. Some will be crashed, some for durability testing, others for NVH testing... the list goes on. The 100 are not going to Roush. Roush will be done with the engineering by that point (if they aren't already). Plastic or Steel? Don't know for sure yet. GM plant is being reworked. A lot of the equipment has been moved around. It doesn't look the same as it did when GM was there. Some things are still in place though. The vehicle dollies haven't been built yet. The ATVM loan HAS actually "given" money to people... Ford, Nissan, and Tesla come to mind. They've done MPG testing on the engine though I don't know how that fared.So I said I would check back in July....I assume they are available and I can take delivery now...right? (LOL)
I read they are hand building 25 units for crash testing. Any other testing?
I read they plan to build 100 units to give to someone for fleet vehicles...are these going to Roush for testing and improvements? Are these to be more hand-built units?
Is there a hard and fast production date yet? ( AND I do mean a real date, not yet another tentative date )
Are they to be made of steel instead of the plastic body panels? I thought I heard that in the video of the plant...maybe I heard it wrong
I saw video of the plant, but there was no actual tooling set up for the Elio...any big changes to that yet, or still basically as it was when GM left?
I see they want money from a fund that is specifically designed for MPG improvements, but has never given anyone any money...what if that fails?
Did they complete any tests on the new engine for fuel efficiency?
Any other important updates I missed?
Thanks for keeping me updated