I don't doubt that. And I hope so.I'm sure it will take less than a week to have to re-ban a lot of the d-bag crowd.
Welcome to Elio Owners! Join today, registration is easy!
You can register using your Google, Facebook, or Twitter account, just click here.I don't doubt that. And I hope so.I'm sure it will take less than a week to have to re-ban a lot of the d-bag crowd.
Only about 35 answers total. This was a very poor showing on Reddit's part and a very short AMA in general. Good answers and all, and sure it blows away most of the AMAs in the /r/AMA sub, but it's not really the sub an AMA of this (undercut) magnitude should have fallen into. That could have worked out a lot better.Looks like he's off.
Time of day was also working against a large turnout, how many people can jump in during work, or on their way to vacation spots...Only about 35 answers total. This was a very poor showing on Reddit's part and a very short AMA in general. Good answers and all, and sure it blows away most of the AMAs in the /r/AMA sub, but it's not really the sub an AMA of this (undercut) magnitude should have fallen into. That could have worked out a lot better.
This agrees with what Paul Elio told me at the LA Invitation Only event, that they would product 1,000 vehicles a day by 90 days. However I thought more than 19,000 vehicles would be produced during the first 90 days. Apparently the assembly line will be shut down at times during this 90 day period to make changes, so they could achieve the final rate of 1,000 per day.Well looks like they plan on getting through almost half of the reservations in the first 3 months:
[–]texas1982 [score hidden] 53 minutes ago (1 child)
When you expect that an Elio will be available for purchase for a guy that didn't put down a reservation? I'm excited to own one, but I am always nervous about putting down cash up front.
[–]PaulElioMotors[S] [score hidden] 18 minutes ago (0 children)
It takes us 90 days to ramp up to full production capacity, during that period we will produce 19,000 vehicles. Then we will produce 1,000 vehicles a day (and there are 250 build days a year). So, you can look at the calendar and approximate when the next non-reserved vehicle will be produced.
This agrees with what Paul Elio told me at the LA Invitation Only event, that they would product 1,000 vehicles a day by 90 days. However I thought more than 19,000 vehicles would be produced during the first 90 days. Apparently the assembly line will be shut down at times during this 90 day period to make changes, so they could achieve the final rate of 1,000 per day.